Skip to content
R&D TaxPartners
Book a call

Engineering · Building services consultancy

A building services consultancy's R&D claim, and HMRC's questions

A building services consultancy claimed R&D on five projects. HMRC raised questions, we answered them, and the enquiry closed with the claim standing.

The client

A UK building services engineering consultancy based in south-east England, trading for more than a decade and growing about 25% a year over five years, largely through repeat business and referrals.

The challenge

  • Spotting the R&D. The company's projects looked like routine engineering. Which ones involved real technological uncertainty?
  • Documenting it. Each project needed the competent professionals, the uncertainties and the advances recorded to the standard HMRC expects.
  • Using the benefit. The year ended 31 March 2024 profit was small, so the relief needed to be used across more than one year.

What we did

  • Identified five projects with genuine uncertainty, including control systems refurbishment for a dynamic rotary UPS power plant, supplementary heating works, automation control adjustment at a sewage treatment plant, a kitchen grease management system and an electrical infrastructure upgrade.
  • Wrote a 46-page report documenting each project, its competent professionals, uncertainties and advances.
  • Prepared the 23-page additional information form and submitted the claim with the company tax return, under the SME scheme rules that applied to that period.
  • Answered HMRC's questions when they came, from the documented technical case.

The outcome

  • The total R&D deduction available was £369,523.
  • It eliminated the year's taxable profit of £58,014, repaying £11,624 of corporation tax, then eliminated the following year's profit of £258,920, saving £64,730.
  • The remaining £52,589 carried into the year after, worth a further £9,992 to £13,147 depending on the rate.
  • A total tax saving of about £86,000 to £89,500 across three years.
  • HMRC raised questions on the claim. We answered them and the enquiry was closed with the claim standing, with no reduction.

What it shows

Routine-looking projects can contain real uncertainty, and careful selection and documentation bring it out. The relief can also be used over several years. And when HMRC does ask questions, a claim built on evidence is a claim you can defend.

FAQs

Frequently asked questions

What kind of company is this case study about?

A UK building services engineering consultancy based in south-east England, trading for more than a decade, with about 25% year-on-year growth over five years built on repeat business and referrals. It claimed for the year ended 31 March 2024. It is an example of a sector where qualifying work is easy to overlook, because the projects look like ordinary client engineering work.

Can routine-looking building services work be R&D?

Sometimes. The five projects included refurbishing the control systems of a dynamic rotary UPS power plant, supplementary heating works, adjusting the automation control of a sewage treatment plant, a kitchen grease management system and an electrical infrastructure upgrade. Careful selection and documentation showed where genuine technological uncertainty lay. The careful part was telling genuine uncertainty from routine work.

What happened when HMRC raised questions on the claim?

HMRC wrote with questions about the claim. We answered them, and the enquiry was closed with the claim standing, with no reduction. The detailed technical report and additional information form prepared at the outset gave us the evidence to respond clearly. That outcome is a fact about this claim, not a promise about any other, but it reflects how we prepare every claim.

What documentation supported the claim?

A 46-page report documenting each project with the competent professionals involved, the technological uncertainties and the advances sought, plus the 23-page additional information form. Both were submitted with the company tax return. Having this evidence in place before filing is what made the later HMRC questions answerable. We keep this evidence organised for every claim we prepare.

How much was the R&D deduction worth?

The total R&D deduction available was £369,523. It was used first against the year's taxable profit of £58,014, which it eliminated, leading to £11,624 of corporation tax being repaid. The remainder was carried forward, so the benefit was not limited to the year of the claim. The figures come from the client's own claim file.

How did the benefit carry across several years?

After eliminating the year's profit, the balance was carried forward against the following year's profit of £258,920, eliminating it and saving £64,730 of corporation tax. The £52,589 left was carried into the year after, saving a further £9,992 to £13,147 depending on the rate. The range reflects whether the lower or the higher corporation tax rate applies to that last amount.

How much tax did the client save in total?

About £86,000 to £89,500 across three years, with the range reflecting the rate that applied to the final carry-forward. These are the client's actual figures from this claim. They are not a forecast for any other company, since every claim depends on its own projects, costs and profits. Savings on this scale depend on the profits available to absorb the deduction.

Which scheme rules applied to the consultancy's claim?

The period ended 31 March 2024 and began before 1 April 2024, so the claim was made under the SME scheme rules that applied to that period. Claims for periods beginning on or after 1 April 2024 now go through the merged scheme or ERIS. Which rules apply always depends on when the period began, so the first step on any claim is to check the dates.

Does this mean every R&D claim by an engineering consultancy will succeed?

No. This case shows that building services projects can contain real uncertainty, and that evidence and honest project selection matter. Each claim stands or falls on its own facts, and we tell you plainly if a project does not qualify. We would rather exclude a doubtful project at the start than defend it later, and we make that call with you before filing.

What does this case show about enquiry defence?

That a claim built to be defended can be defended. The questions HMRC raised were answered from a documented technical case, and the claim stood without reduction. It also shows why, if HMRC writes, the first reply should be considered and evidence-led rather than sent in a hurry. Our enquiry defence page explains the process.

Talk to an R&D tax specialist.

A confidential first conversation about your claim or your HMRC enquiry. We reply the same working day.

Or write to taxadvisory@aswatax.co.uk

Chartered Tax Adviser
Message us on WhatsApp (opens in a new tab)